Proofer (AW4000 Style)

The rods used are 1/4″ steel sewer rod, the ideal tensile strength is selected to make these proofers. The ultimate sewer tools when jetting down the line. These are trusted in the industry as a go to tool. The pipe is schedule 80 with a painted finish. If a rod has a wear and tear then simply remove it and purchase a replaceable runner for this AW4000 Style.

1″ Size 3/4″ Size Description
AW4002-6 AW4001-6 6″ and Up
AW4002-8 AW4001-8 8″ and Up
AW4002-10 AW4001-10 10″ and Up
AW4002-12 12″ and Up

* “-” indicates size not available.

1/4″ Replacement Rods for the Proofer Style AW4000 use tensile strength that is selected carefully to protect your investment from sewer nozzles, jetting hoses, and couplings

Replacement Runner Description
AW4003-6 6″ Replacement Wire for AW4000 Style (Sold as Each)
AW4003-8 8″ Replacement Wire for AW4000 Style (Sold as Each)
AW4003-10 10″ Replacement Wire for AW4000 Style (Sold as Each)
AW4003-12 12″ Replacement Wire for AW4000 Style (Sold as Each)

Available for retail purchase on our official Shopify store.
Click the logo below to shop this product.Max-Life MFG, Sewer Cleaning Tools

Proofer AW4000 Style

Sewer nozzle proofer with steel runner rod construction designed for guiding and protecting jetting nozzles inside pipelines.

The Proofer AW4000 Style is designed to guide and protect sewer jetting nozzles while operating inside pipelines. This sewer nozzle proofer uses 1/4″ steel runner rods selected for appropriate tensile strength to support jetting operations.

The skid frame is constructed from Schedule 80 pipe and includes a painted finish for use in sewer maintenance environments. The design allows individual runner rods to be replaced if wear occurs during operation, supporting maintenance and continued use of the skid assembly.

The unit is available with 1″ or 3/4″ hose connections for use in larger sewer pipelines. Replacement runner rods are also available for maintaining the skid assembly.


Key Features

  • 1/4″ steel runner rods for nozzle support
  • Schedule 80 pipe frame construction
  • Painted finish for sewer maintenance environments
  • Replaceable runner rods for maintenance and service
  • Hose connection options: 1″ or 3/4″

Applications

  • Sewer jetting operations
  • Nozzle guidance and protection inside pipelines
  • Municipal sewer maintenance
  • Contractor jetting equipment setups